Click to view our Accessibility Statement or contact us with accessibility-related questions
Built a new fixture, just for making these more efficiently this time. It's an improvement on the one I made for the single-bottle stand at the end of last run, with expansions to hold the four-bottle blanks as well. Should let me cut down a lot on tool changes and greatly speed production up at that step, it sure did for the single-pen stands!
First four blanks are cut and planed, they start machining tonight. These will likely run in four-stand batches this time, it's a nice, efficient number for me to work with. I tried five at a time last run, and it was one too many to fit my drying rack without crowding. The first four should be ready to go this weekend, with others following on my usual one-a-day schedule, more or less.
The material is all racked up in the shop and looking good! I tried to pick more traditionally "walnut" coloured walnut this time, the example stand I built for Massdrop was with the last of my existing material which was considerably lighter than normal. Production models should be closer to the colour of the single-ink stand that's shown. Using natural wood, it's always fun to see the variation!
Darkvlade
88
Jan 29, 2016
Komitadjie
search
Dunno if i uploaded this before but..this is the stand from the first drop....i would have use a paper background but..its late and i feel too lazy to go into the shop for paper >.<
DarkvladeThanks for the photo, man! Looks cool. :)
First four are drying their first coat of finish now, I hope to have the finishing done on them by tomorrow. The second four blanks are cut, and are machining right now. I would like to have the machining done on them by the end of this evening. The pen stands to go on them will be built most likely Sunday afternoon.
Darkvlade
88
Jan 30, 2016
KomitadjieThanks :) They ARE kool.... which is why I am joining for another 4 ink one. :)
DarkvladeWell, hopefully you'll get a kick out of this one too! Number eight is completing the first stage of machining right now, two more to run through first-stage tonight, then six to run through second-stage. This new fixture is massively speeding up the machining!
Trending Posts in Battlestations